Boiler flu and solar panel cleaning access meant our customer required edge protection on the roof of this 7 storey building in the centre of Brighton.
PVF attended site and designed a series of scaffolds to allow the access required whilst not disrupting the residents or local roads and pedestrian footpaths. Material access to parts of this site required the tube to be carried through a Church for which great care was taken.